GOT 1000CC-Link communication unitUser's ManualGT15-J61BT13MITSUBISHI ELECTRICMITSUBISHI ELECTRICArt. no:IB(NA)-080035101072007Version CINDUSTRIA
A-9Compliance with the EMC and Low Voltage DirectivesWhen incorporating the Mitsubishi GOT into other machinery or equipment and keeping compliance wi
A-10Packing ListThe following items are included.*1 Use it when using the Ver.1.10 compatible CC-Link dedicated cable/ Ver.1.00 compatible CC-Link de
11. OverviewThis user’s manual introduces the model GT15-J61BT13 CC-Link communication unit (hereinafter referred to as CC-Link communication unit) u
22. Specifications2.1 Performance SpecificationsThe following is the performance specification of CC-Link communication unit.The general specification
3*3 The number of link points per station depends on the mode setting of CC-Link as shown below.For CC-Link Ver.2For CC-Link Ver.1*4 The number of l
42.2 Specifications of terminal block socketItem SpecificationsScrew tightening torgueWiring screw Terminal block fixing screw : 0.5 to 0.6 N•m: 0.7
53. I/O Signals and Remote Register Assignment3.1 I/O Signals Transferred to/from the Master ModuleThe following table lists the I/O signals assigned
6*1 When the mode setting of CC-Link is Ver.1, the extension cyclic setting is not available. (Fixed to Single)*2 The remote READY flag is on durin
73.2 Remote Register AssignmentThe following is the assignment of the remote registers of the GOT.The remote registers differ according to the set num
84. Part Names and External DimensionsGT15-J61BT13Dimensions of X when the CC-Link communication unit is mounted to the GOT.15”,10.4” 21(0.83)12” 18(0
A-1zSAFETY PRECAUTIONSz(Always read these instructions before using this equipment.)Before using this product, please read this manual and the relevan
97)Terminal block socketSocket for connecting the CC-Link dedicated cable to the CC-Link communication connector8)Operationindicator LEDThis indicates
10Extension interface relay boardUnit:mm(inch)64(2.52)24(0.94)27.5(1.08)
115. Installation Procedure5.1 CC-Link communication unit installation(1) Power off the GOT.(2) Remove two extension unit covers of the GOT.(3) Attach
12(5) Fasten the CC-Link communication unit by tightening its mounting screws (4 places) with tightening torgue 0.36 to 0.48 N•m.(6) Fasten the bus co
135.2 Terminal block socket installation (1) Insert the terminal block socket in the CC-Link communication unit.(2) Fasten the terminal block by tight
146. Wiring MethodThe following diagram shows how to wire the GOT and CC-Link system modules.(1) Wiring the GOT and CC-Link system modules by CC-Link
15(2) When connecting the terminating resistor and FG cableWhen connecting the terminating resistors to the GOT, be sure to connect the terminating re
16MEMO
HEADQUARTERSEUROPEMITSUBISHI ELECTRIC EUROPE B.V.German BranchGothaer Straße 8D-40880 RatingenPhone: +49 (0)2102 / 486-0Fax: +49 (0)2102 / 486-1120CZE
A-2[DESIGN PRECAUTIONS][INSTALLATION PRECAUTIONS]z Some faults of this unit may keep the outputs on or off. An external monitoring circuit should ther
A-3[INSTALLATION PRECAUTIONS][WIRING PRECAUTIONS]z Use this unit in the environment given in the general specifications of GT15 User's Manual.Not
A-4[WIRING PRECAUTIONS][TEST OPERATION PRECAUTIONS]z Tighten the terminal screws within the specified torque range.Undertightening can cause a short c
A-5[STARTUP AND MAINTENANCE PRECAUTIONS][DISPOSAL PRECAUTIONS]z Do not touch the terminals while power is on.Doing so can cause an electric shock or m
A-6[TRANSPORTATION PRECAUTIONS]z Make sure to transport the GOT main unit and/or relevant unit(s) in the manner they will not be exposed to the impact
A-7REVISIONS* The manual number is noted at the lower right of the top cover.© 2006 MITSUBISHI ELECTRIC CORPORATIONPrint Date *Manual Number RevisionM
A-8CONTENTS1. Overview ..........................12. Specifications ...
Commentaires sur ces manuels